Our One30 development represents the single largest privately developed building constructed in Darwin’s CBD
(45,000m2 floor area)
_____
Sector
Residential
Contract value
$100 million
Completion date
2009
Location
Darwin City, Northern Territory
Status
Completed
Type of project
Design and construction components
Client
Developed by DCOH
(formally known as Halikos in 2009)
Awards
Highly Commended 2010 Master Builders NT Excellence Awards for Multiple Dwellings Apartment, over 11 Storeys Building
One30 Esplanade features two pairs of conjoined towers with design innovations allowing every apartment to boast 60% of its perimeter having access to uninterrupted sweeping views, natural light and ventilation. All the 128 apartments (180m2 each) feature three bedrooms with separate living, dining, family room spaces, and an additional 35m2 of outdoor living.
Each floor of every tower has only 2 residents serviced by 2 secure lifts. This equates to an average of one lift for every 16 apartments.
With a mix of owner occupier and serviced apartments for corporate and long-term lease, management of this property is by Solis and the serviced apartments are managed by Thyme.
From the conception of the project, DCOH understood the key to project success rested in the effective management of the logistics of constructing such a large scale, complex structure.
Project features:
- 45,000m3 basement excavation in porcellanite rock, 9 meters deep over 3 levels, and 5000m2 footprint per level. NB: Dimensionally, this is almost identical to the completed State Square Underground Carpark
- 64 suspended slab pours in 4 towers
- 3 storey underground carpark
- 4 building cores constructed using jump form technology
- 2 No. tower cranes, 4 No. man material hoists, 4 No. fixed concrete pumps (satellite concrete booms)
- Complex structural steel
- Extensive roofing and wall cladding
- High quality fit out
- High density, urbanised and live operational environments
- Strict vibration, dust and noise controls
- Complex pedestrian and traffic management
- Management of up to 250 site personnel